Utility-scale decommissioning, recovery and restoration

Wind & Solar Farm Demolition

A specialist platform for safely dismantling decommissioned renewable-energy assets, recovering valuable materials and returning project land to healthy, beautiful environments.

20-30 years

Typical solar panel service life means end-of-life planning now needs to be built into asset strategy.

~1M tonnes

Forecast Australian solar panel waste by 2035 shows the scale of the recovery challenge ahead.

Recovery first

Steel, copper, aluminium, glass, electronics and blades need separated pathways before removal begins.

Before and after restoration

Show the land before removal, then show it returned to nature.

The standard we design for is zero visible industrial footprint after closeout: no redundant towers, panels, tracks, hardstands, foundations, fencing or disturbed ground left behind.

Existing wind farm before decommissioning with turbines, access tracks and hardstand areas
Before: wind farm infrastructure
Restored rural ridge after wind farm removal with native grasses and no visible infrastructure
After: restored ridge country
Wind farm handback

From turbine pads and access roads to a restored ridgeline.

Towers, blades, nacelles, hardstands, cables and redundant access works are removed or remediated, then the landform, drainage and vegetation are repaired for the agreed future land use.

Existing solar farm before decommissioning with rows of panels, fencing and service tracks
Before: solar farm infrastructure
Restored rural land after solar farm removal with native vegetation and no visible solar infrastructure
After: natural land return
Solar farm handback

From panel rows and service tracks to clean open land.

Modules, racking, piles, fencing, inverters and cabling are removed through separated recovery streams, while compacted ground and disturbed areas are rehabilitated back into the surrounding environment.

Representative restoration visuals for launch. Replace with verified project photography and monitoring records as completed sites become available.

Why this market needs a dedicated leader

Renewable infrastructure was built at speed. Its removal must be planned with more discipline.

Aging asset fleets

Early wind and solar projects are moving toward repowering, major component replacement or full removal. Owners need a clear pathway before decommissioning becomes urgent.

Higher compliance expectations

Decommissioning plans, financial security, resource recovery records and rehabilitation evidence are becoming central to approvals, community trust and investor confidence.

Land must be handed back better

Removal is not finished when the last panel or turbine section leaves site. Tracks, hardstands, foundations, drainage and vegetation need a managed restoration closeout.

The WSD method

One accountable process from first audit to restored land.

We structure decommissioning as a controlled infrastructure project: measured, sequenced, documented and transparent to landowners, regulators, asset owners and global corporate stakeholders.

01

Asset audit

Map turbines, panels, inverters, substations, cabling, foundations, roads, hardstands, batteries and site constraints.

02

Recovery plan

Assign every major material stream to reuse, resale, recycling, specialist processing or compliant disposal.

03

Safety and approvals

Build lifting plans, electrical isolation, traffic controls, environmental controls and stakeholder notifications.

04

Sequenced removal

Dismantle turbines, arrays and balance-of-plant assets with minimal land disturbance and controlled logistics.

05

Verified sorting

Separate metals, glass, e-waste, concrete and composites with weight tickets, chain-of-custody records and photos.

06

Site restoration

Remove redundant infrastructure, regrade disturbed areas, restore drainage and support revegetation or productive land use.

Services

Complete removal capability for wind and solar farm owners.

Wind farms

High-risk dismantling managed with engineering discipline.

  • Turbine blade, hub, nacelle and tower removal
  • Crane, rigging, lift planning and exclusion zones
  • Transformer, substation, cable and met mast removal
  • Foundation breakout, partial removal or capped remediation
  • Access road, hardstand and laydown-area rehabilitation
Wind farm demolition service
Solar farms

Fast, clean array removal with material separation at source.

  • Panel removal, palletising, testing and recycling logistics
  • Racking, tracker, pile, inverter and combiner removal
  • Cable trench, conduit, fencing and drainage closeout
  • Battery container, inverter and e-waste handling pathways
  • Soil compaction repair and revegetation support
Solar farm demolition service
Turnkey closeout

Evidence-ready reporting for boards, regulators and communities.

  • Decommissioning strategy and budget planning
  • Resource recovery and waste minimisation registers
  • Contractor coordination and procurement packages
  • Landowner, council and community evidence packs
  • Post-works defect, vegetation and warranty closeout
Land restoration service

Circular demolition

Demolition is the start of recovery, not the end of responsibility.

The strongest decommissioning projects sort assets before they hit the ground. That is how owners reduce landfill exposure, protect ESG commitments and keep valuable materials moving back into productive use.

Build a recovery plan
Steel towers and frames Scrap resale and melt stream
Copper and aluminium Separated high-value metals
Solar glass and modules Panel recycling and recovery pilots
Inverters and batteries Licensed e-waste and hazardous handling
Concrete and foundations Crush, reuse or approved removal
Composite blades Reuse, processing or compliant last resort

Beautiful environments returned

We remove the industrial footprint and plan for what comes after it.

Wind and solar projects can change ridgelines, paddocks, access tracks and drainage paths. Our restoration approach focuses on returning land to its agreed future use: native habitat, agriculture, grazing, conservation or clean development-ready ground.

Landform

Regrade hardstands, turbine pads, trenches and access areas so water moves naturally and erosion risk is reduced.

Soil

Separate, protect and reinstate topsoil where possible, with attention to compaction, contamination and sediment control.

Vegetation

Support native revegetation, pasture return or landowner-specified planting with documented establishment criteria.

Evidence

Deliver photo records, recovery certificates, disposal receipts and closeout packs fit for board and regulator review.

Built for global asset owners

A world-leader standard for a worldwide decommissioning wave.

Multinational owners, developers, OEMs, financiers and insurers need one accountable decommissioning partner that can coordinate local crews while maintaining a consistent governance standard across regions.

Single lead contractor

One program office for scope, risk, procurement, permits, reporting and stakeholder communication.

Local delivery network

Regional operators matched to site conditions, transport routes, language, regulation and labour requirements.

Board-level evidence

Clean dashboards for recovery rates, costs, defects, schedule, incidents, emissions and restoration progress.

Future-focused standards

Designed around product stewardship, circularity, social licence and landowner handback rather than simple disposal.

Project enquiry

Plan removal before the asset reaches the end.

Send the asset type, approximate size, location and timeframe. We will shape the first decommissioning pathway: risks, recovery streams, approvals, logistics and restoration outcomes.

[email protected] Australia-based. Global project capability.